Top Tips For Installing Your Wooden Flooring
- AlexJones
- 0
- 431
Moisture is the number one cause of problems when it comes to installing wooden Stained Concrete College Station. With this in mind it need not be, take the proper procedure to handle it and it will not be a problem. The problem is that a lot of flooring installers do not take this into consideration.
What quite often happens is that wood flooring is delivered straight to the job site in the winter. The flooring came from a reputable supplier and the wood was stored in a climate-controlled warehouse. After arriving at the job site delays happen and the wood ends up sitting around for a while. Not knowing the affects on solid wood flooring the temperature is increased by the heating in the building. The flooring is fitted and everything is fine, the next winter the customer rings to say that the flooring has gaps between the boards.
The cause of the problem is that the flooring acclimated to the conditions of winter when it first arrived, when it then acclimated to the hot summer humidity it swelled up and the edges of the board was damaged, the next winter the swelling reduced and the gaps were much larger than they should be.
Prevention
The best way to avoid this happening is to install the flooring when the moisture content is at a good medium, between the two seasons. The other way to solve the problem would be to not nail the flooring as tight as you normally would and leave “washer rows” to allow some swelling in the winter months without damaging the flooring.
- Make sure any controllable moisture affective work on the house has been completed such as installation of windows and doors.
- Measure the temperature at the job site. It should be at what is considered as normal living conditions.
- Make sure that gutters are in place and correctly installed so that all water drainage is going to go away from the house and not to the foundations as this will increase the moisture.
- Use a good moisture retarder for your wood flooring. If moisture is of real concern to you an engineered wood flooring may be of better suit to you as it is a lot more tolerant to heat and moisture changes.
Prepare the Subfloor
Subfloors should be clean, flat and dry. Not doing so can lead to many problems with the flooring its self. These problems can be seen as loose flooring, squeaky joints, deflection and uneven surface.
The dry part of the Subfloor equations come from the moisture content in the air as discussed in the earlier point “check moisture”. The clean part means that all debris and general dirt from the work site must be clean and cleared away from the subfloor and also that anything that may interfere with the adhesive that is going to be used with the flooring is cleaned off. The floor must be flat to industry standards, subfloors that are not flat enough should be flattened before the flooring is installed. Many problems stem from using an inappropriate sub floor for the flooring used, it is crucial to get this right the first time!
Take the time to layout the room properly
The main aim of this point is to get across that you should not jump straight into the job and start laying the flooring straight away. Take the time to plan out the job exactly.
While it may work for some to just start laying the flooring straight away it can cause major cosmetic problems. As you move from room to room angles can change as rooms are never perfectly square this leads to crooked flooring spreading through the rooms, a slight change in angle from the required 90 can have major consequences leading trouble for the fitters having to trim down flooring and as mentioned earlier the cosmetics of the flooring will be harmed.